Projet

Général

Profil

Mical-008 to do list » Historique » Révision 6

Révision 5 (Frederic Elisei, 18/03/2025 14:53) → Révision 6/10 (Frederic Elisei, 18/03/2025 18:59)

h1. Mical-008: to do list 

 * *DONE:* install and testTTS *<-- forced to have a python3.10* TTS 
 * *DONE:* test whisper 
 * load test, with everything at the same time 
 * have LLM run as a YARP service 
 * transfer yolo training/inference from Windows PC